Constructora Vialpa, S.A.
Plastic Processing Industrial Complex — Injection Modules M6, M7, M8, M9 and M10
Industrial

Plastic Processing Industrial Complex — Injection Modules M6, M7, M8, M9 and M10

2011

Project sheet

Sector
Industrial
Client
Ministerio del Poder Popular para Ciencia, Tecnología e Industrias Intermedias — Corpivensa
Location
San Francisco de Yare, Simón Bolívar Municipality, Miranda State, Venezuela
Year
2011
Investment
BsF. 275,000,000 (Oct 2011) + BsF. 39,194,341 (complementary contract)
Vialpa Role
Construction of industrial modules and complementary civil works

Project overview

Construction of modules for the socialist plastic-processing factory promoted by the Ministry of People's Power for Science, Technology and Intermediate Industries with its affiliate Corpivensa, divided into two locations (Ocumare and Yare). As part of the first phase, five modules with thirteen injection machines each are planned, for a total of 65 injection machines, plus a molds-and-dies module for maintenance and mold manufacturing. Additional contracted works include preliminary works, installation, voice and data, culverts, foundation, grounding system, internal roads, earthworks, concrete works, formwork, steelworks, asphalt, signage, a multipurpose sports court, sports equipment, enclosures, electrical installations, landscaping, external furniture and complementary works.

The Challenge

Build five industrial modules simultaneously with their civil and complementary installation works, coordinating civil, electromechanical and services works to enable an operational plastic-processing plant.

Vialpa Scope

Construction of five injection modules (M6, M7, M8, M9 and M10) with 13 machines each, molds-and-dies module, and complementary works: preliminary, installation, voice and data, culverts, foundation, grounding, internal roads, earthworks, concrete, formwork, steel, asphalt, signage, sports court, equipment, enclosures, electrical, landscaping and furniture.

Engineering / Construction Approach

Phased execution coordinating the supporting civil works with the installation of the injection lines and service systems, ensuring the progressive commissioning of each industrial module.

Technical Highlights

  • 5 modules with 13 injection machines each (65 machines total)
  • Molds-and-dies module for maintenance and mold manufacturing
  • Comprehensive civil works: earthworks, concrete, formwork, steel, asphalt and electrical
  • Contract signed September 6, 2011 with Corpivensa

Key Quantities

5
Modules (Phase I)
65 (13 por módulo)
Injection machines
06/09/2011
Contract signed
Corpivensa
Client
Project Gallery

Photographic archive and field execution

Original photographic field documentation of road execution, structures, concrete barriers and earthmoving by Constructora Vialpa.

Completed industrial injection hall with operational line of injection machines, workstations and high-strength polished concrete flooring
Field Archive

Completed industrial injection hall with operational line of injection machines, workstations and high-strength polished concrete flooring

Battery of high-precision plastic injection molding machines installed in the production module with pneumatic and electrical connections
Field Archive

Battery of high-precision plastic injection molding machines installed in the production module with pneumatic and electrical connections

Specialized molds-and-dies module equipped with 5-ton overhead crane, lathes, CNC milling machines and machining centers for mold maintenance
Field Archive

Specialized molds-and-dies module equipped with 5-ton overhead crane, lathes, CNC milling machines and machining centers for mold maintenance

Assembly of reticulated structural steel frame, runway beams for overhead crane, siding panels and service raceways in industrial hall
Field Archive

Assembly of reticulated structural steel frame, runway beams for overhead crane, siding panels and service raceways in industrial hall

Structural steel erection phase of main frames and trusses over reinforced concrete foundations and slab
Field Archive

Structural steel erection phase of main frames and trusses over reinforced concrete foundations and slab