Project overview

Construction of a dual carriageway (“Par Vial”) parallel to the existing Morón – Coro highway: a four-lane road in its first section, covering 11.5 km, plus the construction of three bridges. The project serves as an excellent alternative for achieving smooth traffic flow in the region.

The Challenge

Build a four-lane dual carriageway parallel to an existing road, integrating three bridges and associated structures, without compromising regional traffic operations along the Morón – Coro highway.

Vialpa Scope

Construction of 11.5 km of four-lane dual carriageway, three bridges and drainage and structural works associated with the Morón – Boca de Aroa Par Vial.

Engineering / Construction Approach

Deployment of road machinery for earthworks, paving and bridge construction, coordinated with the operation of the existing highway to maintain regional traffic flow.

Operational Constraints

Parallel intervention alongside an operational highway, with coordination of road interference and preservation of regional traffic.

Technical Highlights

  • Four-lane dual carriageway parallel to the Morón – Coro highway
  • 11.5 km length in the first section
  • Construction of three bridges
  • Road alternative to improve regional traffic flow

Key Quantities

11,5 km / 4 canales
First section
3
Bridges
>100 MM Bs.
Investment
Instituto Vial Falcón
Client
Project Gallery

Photographic archive and field execution

Original photographic field documentation of road execution, structures, concrete barriers and earthmoving by Constructora Vialpa.

Completed four-lane dual carriageway with asphalt pavement, road markings, and directional signage toward Tucacas and Boca de Aroa along the eastern Falcón coast
Field Archive

Completed four-lane dual carriageway with asphalt pavement, road markings, and directional signage toward Tucacas and Boca de Aroa along the eastern Falcón coast

Cartographic alignment map of the Morón – Boca de Aroa – Tucacas – Chichiriviche coastal corridor (Route 3) along the Caribbean Sea
Field Archive

Cartographic alignment map of the Morón – Boca de Aroa – Tucacas – Chichiriviche coastal corridor (Route 3) along the Caribbean Sea

Massive roadway embankment grading: Caterpillar tamping foot compactor and dump truck fleet discharging granular fill material
Field Archive

Massive roadway embankment grading: Caterpillar tamping foot compactor and dump truck fleet discharging granular fill material

Subgrade compaction and densification with Caterpillar single-drum vibratory smooth roller on active roadwork front
Field Archive

Subgrade compaction and densification with Caterpillar single-drum vibratory smooth roller on active roadwork front

Cross-drainage works and hydraulic structures: steel formwork assembly and concrete casting for headwalls and wingwalls of major pipe culvert
Field Archive

Cross-drainage works and hydraulic structures: steel formwork assembly and concrete casting for headwalls and wingwalls of major pipe culvert