“Par Vial” Construction — Morón – Boca de Aroa
Project sheet
- Sector
- Roadway
- Client
- Instituto Vial del Estado Falcón
- Location
- Tucacas, Falcón State, Venezuela
- Investment
- Over 100 billion bolívares
- Vialpa Role
- Four-lane dual carriageway construction and bridge works
Project overview
Construction of a dual carriageway (“Par Vial”) parallel to the existing Morón – Coro highway: a four-lane road in its first section, covering 11.5 km, plus the construction of three bridges. The project serves as an excellent alternative for achieving smooth traffic flow in the region.
The Challenge
Build a four-lane dual carriageway parallel to an existing road, integrating three bridges and associated structures, without compromising regional traffic operations along the Morón – Coro highway.
Vialpa Scope
Construction of 11.5 km of four-lane dual carriageway, three bridges and drainage and structural works associated with the Morón – Boca de Aroa Par Vial.
Engineering / Construction Approach
Deployment of road machinery for earthworks, paving and bridge construction, coordinated with the operation of the existing highway to maintain regional traffic flow.
Operational Constraints
Parallel intervention alongside an operational highway, with coordination of road interference and preservation of regional traffic.
Technical Highlights
- Four-lane dual carriageway parallel to the Morón – Coro highway
- 11.5 km length in the first section
- Construction of three bridges
- Road alternative to improve regional traffic flow
Key Quantities
Photographic archive and field execution
Original photographic field documentation of road execution, structures, concrete barriers and earthmoving by Constructora Vialpa.

Completed four-lane dual carriageway with asphalt pavement, road markings, and directional signage toward Tucacas and Boca de Aroa along the eastern Falcón coast

Cartographic alignment map of the Morón – Boca de Aroa – Tucacas – Chichiriviche coastal corridor (Route 3) along the Caribbean Sea

Massive roadway embankment grading: Caterpillar tamping foot compactor and dump truck fleet discharging granular fill material

Subgrade compaction and densification with Caterpillar single-drum vibratory smooth roller on active roadwork front

Cross-drainage works and hydraulic structures: steel formwork assembly and concrete casting for headwalls and wingwalls of major pipe culvert