Rehabilitation of Runway 09-27 — Simón Bolívar Intl. Airport, Maiquetía
Transportation

Rehabilitation of Runway 09-27 — Simón Bolívar Intl. Airport, Maiquetía

2019

Project sheet

Sector
Transportation
Client
Instituto Aeropuerto Internacional de Maiquetía (IAIM) / Ministerio del Poder Popular para el Transporte
Location
Maiquetía, La Guaira State, Venezuela
Year
2019
Investment
US$2.9 million
Vialpa Role
Slab demolition, reconstruction and asphalt pavement rehabilitation

Project overview

Rehabilitation of Runway 09-27 at the country's main airport. The most significant activities included the demolition and reconstruction of fractured slabs at the threshold of Runway 09 and the repair of a large depression at intermediate progressions —removing asphalt pavement, bases and contaminated soil— and reconstructing bases and asphalt pavement with appropriate materials according to ICAO regulations.

The Challenge

Execute rehabilitation works on the main runway of the country's most important international airport, under ICAO standards and without compromising airport operations.

Vialpa Scope

Demolition and reconstruction of fractured slabs at the threshold of Runway 09; repair of intermediate depression with removal of asphalt pavement, bases and contaminated soil; and reconstruction of bases and asphalt pavement according to ICAO regulations.

Engineering / Construction Approach

Phased intervention coordinated with airport operations, ensuring compliance with ICAO standards for runway rehabilitation.

Operational Constraints

Execution within an operational international airport, with coordination of access and aeronautical work windows.

Technical Highlights

  • Demolition and reconstruction of fractured slabs at the threshold of Runway 09
  • Repair of intermediate depression: removal of pavement, bases and contaminated soil
  • Reconstruction of bases and asphalt pavement according to ICAO regulations
  • Executed investment: US$2.9 million under strict aeronautical operational coordination

Key Quantities

OACI / ICAO
Standards
US$2,9 MM
Investment
Sept. 2019
Start
IAIM / Min. Transporte
Client
Project Gallery

Photographic archive and field execution

Original photographic field documentation of road execution, structures, concrete barriers and earthmoving by Constructora Vialpa.

Longitudinal perspective of Runway 09-27 toward the Caribbean Sea at twilight: approach lighting system, threshold and ICAO-compliant markings
Field Archive

Longitudinal perspective of Runway 09-27 toward the Caribbean Sea at twilight: approach lighting system, threshold and ICAO-compliant markings

Pouring and surface finishing of high-strength rigid hydraulic concrete airfield slabs at the runway threshold with specialized crew and steel formwork
Field Archive

Pouring and surface finishing of high-strength rigid hydraulic concrete airfield slabs at the runway threshold with specialized crew and steel formwork

Deep excavation and contaminated subsoil removal for intermediate depression remediation: crawler excavator, dozer, and geotechnical grade control
Field Archive

Deep excavation and contaminated subsoil removal for intermediate depression remediation: crawler excavator, dozer, and geotechnical grade control

Structural steel rebar mesh installation and dowel bar placement for load transfer across newly reconstructed airfield pavement slabs
Field Archive

Structural steel rebar mesh installation and dowel bar placement for load transfer across newly reconstructed airfield pavement slabs

Active airfield operations front: motor grader, concrete mixers, and modular slab demolition/reconstruction sequence in front of radar and control towers
Field Archive

Active airfield operations front: motor grader, concrete mixers, and modular slab demolition/reconstruction sequence in front of radar and control towers

Let's discuss your next project.